MDOT Tanner Creek 84″ Relining
MDOT Tanner Creek 84″ Relining
This project consisted of re-lining an existing 84″ CMP culvert 65 feet deep under I-94 for the Michigan Department of Transportation and Berrien County Drain Commission. The end product was a 66″ Weholite pipe manufactured by KWH pipe.